Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 80 results ...

Abdulrahman, A (2010) The development of a performance measurement framework for FE/HE co-location construction projects, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Abo Kanon, H (2017) The motivations, possibilities and constrains of flexible housing practices in the UK and Turkey, Unpublished PhD Thesis, , Heriot-Watt University.

Akoh, S R (2018) Risk management framework for highway construction projects in Nigeria, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructures and Society, Heriot-Watt University.

Al Saudi, I S A (2011) The impediments to the adoption of the design and build project procurement strategy in the Saudi construction industry, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Al-Sharif, F F A (2007) Financial model for private finance initiative projects applied to school buildings, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Alasad, R (2015) Dynamic modelling of demand risk in PPP infrastructure projects: the case of toll roads, Unpublished PhD Thesis, , Heriot-Watt University.

Ali Amjad, A (2003) A causal path model to measure the effects of professional training upon time overruns in Saudi construction industry, Unpublished PhD Thesis, , Heriot-Watt University.

Alkhamali, K S H (2014) Leadership style, organisational culture and disputes in public construction, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Alotaibi, S S (2016) The international contractor's decision to invest: a strategic risk management decision model for public private partnership projects in Saudi Arabia, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Alshehri, A R (2016) Quality management system for building maintenance, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Alsulaiman, Y S (2015) Risk management in Independent Water and Power Plant (IWPP) projects in Saudi Arabia: a grounded theory study to improve effectiveness, Unpublished PhD Thesis, , Heriot-Watt University.

Alsuliman, J A (2014) Effective stakeholder engagement in variation order management at the design stage of public sector construction projects in Saudi Arabia, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

  • Type: Thesis
  • Keywords: communication; conflict; dispute; documentation; focus group; interview; project success; questionnaire survey; stakeholders
  • ISBN/ISSN:
  • URL: http://hdl.handle.net/10399/2767
  • Abstract:
    Variation orders affect the progress of any construction project and can be one of the main factors which may cause failure in delivering a project successfully. It is relatively difficult to deliver a project without any variation orders, which are most likely to occur at the design stage. Variation orders are complex in nature, as they involve the key stakeholders, together with a lot of information that needs to be requested, sent, checked, corrected, approved, clarified, transmitted or submitted, among many other processe. This research aims to develop a model that better manages variation orders in Saudi public construction projects in the design stage by engaging the stakeholders effectively in the process of the variation order management, to save the management time for the variation, improve the communication and relationships among stakeholders and avoid disputes and conflicts. The methodology used to achieve the research aim, influenced by the pragmatic views of the researcher, combined several methods. A series of exploratory interviews investigated the current practice of variation order management in Saudi public construction projects, with its strengths and weaknesses. Then, a questionnaire survey measured the level of power and interest of the different stakeholders in order to develop a model for best practice. Finally, focus group sessions validated the performance and concept of the developed model. The findings indicate that there are currently no formalised approaches to the management of variation orders at the design stage. In addition, there is a general lack of knowledge about managing variation orders. However, the conceptual model of common practice, based on these responses, can be divided into six main stages: identifying the variation order, analysing and evaluating variation orders, estimation, approval, implementation and documentation. Furthermore, the findings reveal a need to develop an appropriate variation order management system in the Saudi construction industry, due to the present lack of stakeholder engagement. A model for best practice of variation order management was then developed. The developed model determines the levels of power and interest, location and position for each stakeholder involved in the process of variation order management. The outcomes of the validation workshop were very positive from the participants. However, the participants put forward some recommendations, which were applied in the final version of the model.

Arab, M Z M (2011) A function-based cost model for early cost advice on new-build schools projects, Unpublished PhD Thesis, School of the Built Environment , Heriot-Watt University.

Auchterlounie, A C (2004) A new quality theory for UK private housebuilding based on definable quality principles, impression management and the control of cognitive dissonance, Unpublished PhD Thesis, , Heriot-Watt University.

Awodele, O A (2012) Framework for managing risk in privately financed market projects in Nigeria, Unpublished PhD Thesis, , Heriot-Watt University.

Azharuddin, M (2019) Integrated carbon emission management for the United Arab Emirates construction industry, Unpublished PhD Thesis, , Heriot-Watt University.

Bageis, A S O (2008) Contractors' decision to bid: development of a bid/no bid strategic decision model, Unpublished PhD Thesis, School of the Built Environment , Heriot-Watt University.

Bausman, D C (2002) An empirical investigation of the relationship between strategic planning and performance of large construction firms, Unpublished PhD Thesis, , Heriot-Watt University.

Bayrak, T (2008) Semi automatic construction progress measurement using a combination of CAD modelling, photogrammetry and construction knowledge, Unpublished PhD Thesis, , Heriot-Watt University.

Bell, K L (1994) The strategic management of projects to enhance value for money for BAA plc, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Boateng, P (2014) A dynamic systems approach to risk assessment in megaprojects, Unpublished PhD Thesis, , Heriot-Watt University.

Carter, K (2005) ConSus: a decision support tool for the procurement of sustainable social housing, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Chan, P W (2005) An interpretivistic approach to understand the factors that affect construction labour productivity, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Connelly, J (2001) Developing guidelines for adopting an environmental orientation for construction and related organisations within the supply chain in the construction industry, Unpublished PhD Thesis, , Heriot-Watt University.

Coutts, A W (1997) Change management in the construction industry: a client's mechanism for control, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Didla, N R (2018) Evaluation of the impact of quality risk management on quality performance in the UAE construction projects, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Elsherif, E M (2007) A decision aid model for the selection of appropriate payment and pricing systems for construction projects, Unpublished PhD Thesis, , Heriot-Watt University.

Emhemed, A E (2005) Comprehensive approach to housing legislation: with reference to housing in Libya, Unpublished PhD Thesis, School of Architecture, Heriot-Watt University.

Essa, R A (2008) A framework for the pre-construction evaluation of sustainable housing projects in the UK, Unpublished PhD Thesis, , Heriot-Watt University.

Fahid, S (2007) An investigation of the effectiveness of total quality management in the UK construction industry: An empirical study, Unpublished PhD Thesis, , Heriot-Watt University.

Falqi, I I A (2011) Knowledge capture and retrieval in construction projects, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Fortea, S M E (1989) An investigation of appropriateness relative to indigenous and modern housing in Libya, Unpublished PhD Thesis, Department of Architecture, Heriot-Watt University.

Fortune, C J (1999) Factors affecting the selection of building project price forecasting tools, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Godawatte, G A G R (2021) Understanding the cost overrun causation in construction megaprojects: a grounded systems thinking approach, Unpublished PhD Thesis, , Heriot-Watt University.

Griffith, A (1984) A critical investigation of factors influencing buildability and productivity, Unpublished PhD Thesis, , Heriot-Watt University.

Hamani, K (2019) Developing a corporate sustainability performance evaluation model of the UAE construction contractors, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Haniff, A P (2017) The alignment of strategic objectives within the context of temporary multi-organisations, Unpublished PhD Thesis, Schoolof Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Ibrahim, A A R (1995) An empirical analysis of the strategic group concept within the UK construction industry, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Ibrahim, Y M (2008) Developing a model for vision-based progress measurement and visualisation of as-built construction operations, Unpublished PhD Thesis, , Heriot-Watt University.

Imanghaliyeva, A (2021) Managing sociotechnical risks in infrastructure projects: Sociotechnical Systems (STS) perspectives on systems, Unpublished PhD Thesis, , Heriot-Watt University.

Kashwani, G A (2017) Enhancing the implementation of safety engineering systems in oil and gas construction projects in the UAE, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Kelly, J R (2005) Managing client value at the strategic briefing stage of construction projects, Unpublished PhD Thesis, , Heriot-Watt University.

Khalid, M S (2010) Abandoned housing development: the Malaysian experience, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Kian Manesh Rad, E (2016) Development of a project complexity assessment method for energy megaprojects, Unpublished PhD Thesis, , Heriot-Watt University.

Kurniawan, F (2013) An integrated project evaluation tool for public-private partnership projects, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Lam, K Y (2017) The role of tacit knowledge in knowledge intensive project management, Unpublished PhD Thesis, , Heriot-Watt University.

Lihakanga, R (2022) Generic wireless sensor network for dynamic monitoring of a new generation of building material, Unpublished PhD Thesis, , Heriot-Watt University.

Lim, B T C (1987) Causal modelling construction project performance, Unpublished PhD Thesis, , Heriot-Watt University.

Lockwood, M (1991) A study of national competitive advantage in construction: the European construction industry, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Lonsdale, J H (2011) Falls from height: risk perception of ladder users within the UK construction industry, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Mahmood, A (1992) Educational interests and needs of owner-managers of small building firms, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Male, S P (1984) A critical investigation of professionalism in quantity surveying, Unpublished PhD Thesis, , Heriot-Watt University.

Marwan, A E (2019) Integrating building information modeling to project management consultants' role and practice in UAE, Unpublished PhD Thesis, , Heriot-Watt University.

Matshidze, L B (2021) Developing a Public Private Partnerships (PPP) framework for implementing road maintenance projects in South African rural communities, Unpublished PhD Thesis, , Heriot-Watt University.

Matthewson, C (1992) The relationship between tactical management and contract procurement in the North American competitive lump sum bidding process, Unpublished PhD Thesis, , Heriot-Watt University.

Mirzaie, S (2022) Influence of BREEAM, BIM, and Soft Landings on lifecycle performance of two non-domestic buildings, Unpublished PhD Thesis, , Heriot-Watt University.

Mohammed, R E (2007) An exploratory system dynamics model to investigate the relationships between errors that occur in construction documents in Saudi Arabia and their possible causes, Unpublished PhD Thesis, , Heriot-Watt University.

Molwus, J J (2014) Stakeholder management in construction projects: a life cycle based framework, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Mughrabi, A O (2019) Change management capability maturity model for contractors in the Kuwaiti construction industry, Unpublished PhD Thesis, , Heriot-Watt University.

Murphy, R (2011) Strategic planning in Irish quantity surveying practices, Unpublished PhD Thesis, Edinburgh Business School, Heriot-Watt University.

Omar, N (2022) Enhancing agile application in construction projects using BIM, Unpublished PhD Thesis, , Heriot-Watt University.

Phung, Q A (2020) Project management for sustainable project success, Unpublished PhD Thesis, , Heriot-Watt University.

Preece, C N (1993) A study of the management of promotion for competitive advantage in UK construction firms, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Prince, R F A (2011) The construction briefing process: evaluating the influence of personality traits on the performance of the consultant project manager, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Quah, L K (1988) An evaluation of the risks in estimating and tendering for refurbishment work, Unpublished PhD Thesis, School of Building Engineering and Surveying, Heriot-Watt University.

Salama, M A (2011) The relationship between the performance of the economy and the costing of building projects: a case study of school buildings in Egypt, Unpublished PhD Thesis, School of the Built Environment, Heriot-Watt University.

Sani, H (1988) An investigation into the influences upon and determinants of perceived quality achievement in the management of construction projects by multivariate analysis, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Setiawan, H (2015) Corporate entrepreneurship capability model for contractors, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Sharqi, R I A (2017) Developing a system for health and safety enhancement and automation in construction sites, Unpublished PhD Thesis, School of Energy, Geoscience, Infrastructure and Society, Heriot-Watt University.

Skinnarland, S (2013) Use of progression planning tools in developing collaborative main contractor-subcontractor relationships in Norway, Unpublished PhD Thesis, Edinburgh Business School, Heriot-Watt University.

Sommerville, J (1993) Recruitment sources and employee turnover in sectors of the construction industry, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Strachan, M E (2013) Energy-led, non-domestic building refurbishment: decision support for a whole-building approach to improvement of operational performance, Unpublished PhD Thesis, School of the Built Environment , Heriot-Watt University.

Tangkitsiri, W (2016) Modelling user satisfaction with transportation public-private partnership projects, Unpublished PhD Thesis, , Heriot-Watt University.

Teo, H P (1990) Decision support and risk management system for competitive bidding in refurbishment work, Unpublished PhD Thesis, Department of Building Engineering and Surveying, Heriot-Watt University.

Teo, R A (2006) Continuous improvement to the construction industry: Enhancing quality through learning, Unpublished PhD Thesis, , Heriot-Watt University.

Wallace, W A (1987) The influence of design team communication content upon the architectural decision making process in the pre-contract design stages, Unpublished PhD Thesis, , Heriot-Watt University.

Werner, J (2012) An investigation of uncertainty dynamics within project management: theoretical and empirical insights, Unpublished PhD Thesis, , Heriot-Watt University.

West, L-J (1982) An investigation into the career choice and occupational perceptions of professional builders and quantity surveyors, Unpublished PhD Thesis, , Heriot-Watt University.

Yatim, Y M (2009) Fire safety models for high-rise residential buildings in Malaysia, Unpublished PhD Thesis, , Heriot-Watt University.

Zulu, S L (2007) The impact of project management process quality on construction project performance: A structural equation model, Unpublished PhD Thesis, , Heriot-Watt University.